• Skip to main content
  • Skip to footer

HBC Group

  • Home
  • About
    • About
    • Wind Farm Experience
    • Job List
  • Services
    • Services
    • Subsea
      • Diving Gallery
    • Topside
      • Topside Gallery
    • Hyperbaric Treatment
  • Vessels
    • Vessels
    • HBC Achiever
    • HBC Supporter
    • HBC Tender
  • QHSE
  • Contact
  • News
    • News
    • Announcements
    • Appraisals
You are here: Home / Appraisals

Appraisals

Rampion 2017

HBC Offshore Solutions Ltd have recommenced the operations supporting Fugro with the installation of the array cables on the Rampion Offshore Wind Farm project.

Fugro is laying and bury 122 array cables with its construction and installation vessels Fugro Symphony and Fugro Saltire and using one of its two Q1400 trenching systems to bury the cables. HBC Offshore Solutions Ltd will provide the rigging teams and cable installation equipment supporting Fugro during the installation of the cables at both the WTG’s and the offshore Substation.

The Rampion Offshore Wind Farm being built by E.ON, the Green Investment Bank plc and Canadian energy company Enbridge, will consist of 116 turbines, each with a generating capacity of 3.45 MW. Construction is expected to be completed in 2018.

UK Subsea Campaign 2017 – DONG Energy

HBC is proud to announce that we have once again been awarded the UK Subsea Inspection Campaign across DONG Energy’s Wind Farm’s in the United Kingdom.
Following the successful campaign of the previous year, HBC is looking forward to the opportunity to, once again, show our great capabilities and experience within the field.

This year we will be carrying out Subsea Inspections on offshore structures across five UK wind farms: Race Bank, Westermost Rough, Burbo Bank, Walney and Barrow.

Rampion

HBC Offshore Solutions Ltd part of the HBC Group are proud to announce that we have been awarded with the contract to support Fugro with the installation of the array cables on the Rampion Offshore Wind Farm project.

thumb_IMG_2644_1024

Fugro will lay and bury 122 array cables with its construction and installation vessels Fugro Symphony and Fugro Saltire and using one of its two Q1400 trenching systems to bury the cables. HBC Offshore Solutions Ltd will provide the rigging teams and cable installation equipment supporting Fugro during the installation of the cables at both the WTG’s and the offshore Substation.

The Rampion Offshore Wind Farm being built by E.ON, the Green Investment Bank plc and Canadian energy company Enbridge, will consist of 116 turbines, each with a generating capacity of 3.45 MW. Construction is expected to be completed in 2018.

HBC UK Ltd. has been awarded the DONG Subsea Inspection Campaign for UK

Later this week HBC UK Ltd. will commence Diving  and ROV operations on the awarded the DONG Subsea Inspection Campaign for the United Kingdom.

HBC Achiever

The Inspection Campaign includes the wind farms Burbo Bank Offshore Wind Farm, Barrow Offshore Wind Farm, Gunfleet Sands Offshore Wind Farm, London Array Offshore Windfarm, West of Duddon Sands Offshore Windfarm & Walney Offshore Wind Farm.

The tasks will include: General Visual Inspections, Marine growth Inspections, Inspection of the Cathodic Protection System, Close Visual Inspections of Grout Seal, Cable and Cable Route System & Wall Thickness Measurements.

ISO 9001 certified

9

At HBC we have always had a great focus on delivering high Quality Products and Services.

We see the tools provided by the ISO standard as great way to evolve the organization, in order to continually provide quality solutions to our customers.

Mads Albér

DBB

Your setup appears very pro and i was impressed by your guys’ subsurface efficiency

Mads Albér

Master Mariner DBB
  • « Go to Previous Page
  • Go to page 1
  • Go to page 2
  • Go to page 3
  • Go to page 4
  • Go to page 5
  • Go to Next Page »

Footer

Hyperbaric Consult A/S

Havnen 5, 1.st
3250, Gilleleje
Denmark



Contact

Hyperbaric Consult Ltd

The Adelphi Mill
Grimshaw Lane
Bollington, Cheshire
SK105JB
United Kingdom

Contact

Offshore Solutions Ltd

The Adelphi Mill
Grimshaw Lane
Bollington, Cheshire
SK105JB
United Kingdom

Contact
  • LinkedIn
  • YouTube

Copyright © 2021 · Executive Pro on Genesis Framework · WordPress · Log in